The Weekly Dirt: Two Roads sues Biscayne 21 holdout owners
Two Roads Development sued the holdout owners at Biscayne 21, adding another twist to the saga. The developer has been locked in litigation with the holdout owners of the bayfront condo building in Miami’s Edgewater since 2023. A year earlier, Two Roads paid about $150 million for the majority of units at the building, which was constructed in 1964. The developer then launched sales of an Edition-branded condo project. Last year, as part of the holdout owners’ suit, the developer-controlled condo association was found to have illegally amended the condo declaration to lower the requirement for a condo termination to […]This article originally appeared on The Real Deal. Click here to read the full story.
Recent Posts

Buyer of Wynwood office building alleges “dangerous conditions” and “Band-Aid” repairs in suit against East End

Golden Beach spec home asking $80M tops signed contracts in Miami-Dade

BH, Lennar tap Elliman to sell single-family homes on former golf course west of Aventura

Oceanfront mansion lists for $195M in potential Palm Beach record

Resi roundup: Architect’s landmark Palm Beach home sells for $28M, waterfront mansion goes for $27M

Marina showdown: Inside the proposed $80M redevelopment of Rickenbacker Marina, Marine Stadium Marina

South Florida’s top deals: Former Pfizer exec sells Palm Beach home for $27M

Wealth building starts with behavior, expert tells Realtors

BREAKING NEWS: Florida Realtors supports property tax reform

South Florida Dirt: Mandarin Oriental Boca Raton developer fires back

